Colombia

The CS Engineering team was involved in the design and construction of a 9 ft.  indirect TDU for a British Petroleum project in Colombia. The project was the first successful project of its kind in Colombia.

The unit designed was a 15 ton an hour unit that was capable of handling drill cuttings with 30% oil and 25% water by weight. The unit exceeded expectations by actually remediating at 20 tons an hour for a large portion of the project.  The project was the first project to ever utilize recycled oil for beneficial use, utilizing the oil to fuel the burners.